Six Sigma Green Belt (CSSGB) Sample Questions

  1. Home
  2. Six Sigma Green Belt (CSSGB) Sample Questions
Six Sigma Green Belt (CSSGB) Sample Questions

Under the direction of the Six Sigma Black Belt, the Six Sigma Green Belt (SSGB)-ASQ is in charge. Green Belt staff members are in charge of identifying and resolving quality problems in order to raise project quality. It is an open book exam with candidates. CSSGBs are experts at identifying issues, analysing data, and coming up with quality-improving cost-cutting measures. The article provides a list of Six Sigma Green Belt (CSSGB) Sample Questions that cover core exam topics including –

  • Learning about Six Sigma and the Organization (13 Questions)
  • Understanding Defining Phase (23 Questions)
  • Understanding Measuring Phase (23 Questions)
  • Understanding Analyze Phase (15 Questions)
  • Understanding Improve Phase (15 Questions)
  • Understanding Control Phase (11 Questions)

Q1)Which of these principles is achieved through the employment of station warning lights, tool boards, and jidohka devices in the application of Lean in Six Sigma Green Belt (CSSGB) Sample Questions?

  • A. Pilferage Minimization
  • B. Visual Factory
  • C. Management Awareness
  • D. Operator Attentiveness

Correct Answer: B

Q2)Which of these 5S’s is predominantly driven by management, despite the fact that management of a company must set the framework for all improvement efforts?

  • A. Straighten
  • B. Sort
  • C. Shine
  • D. Sustain

Correct Answer: D

Q3)When pulling systems are used to schedule when goods or services are produced, Kanbans operate best.

  • A. True
  • B. False

Correct Answer: A

Q4)When adopting SPC for your process, SPC on the outputs is recommended over SPC on the inputs.

  • A. True
  • B. False

Correct Answer: B

Q5)Many causes that may be categorised using which of the terms shown result in significant variation in process performance.

  • A. Common
  • B. Random
  • C. Uneducated
  • D. Special
  • E. Vital

Correct Answer: A and D

Q6)With effective SPC implementation in a process, Control Limit and Center Line calculations can be set up over a periodic time period.

  • A. True
  • B. False

Correct Answer: A

Q7)The most current data point is normally on the right hand side of SPC charts, where the data are displayed.

  • A. True
  • B. False

Correct Answer: A

Q8)Which statement or statements best describe a bad SPC implementation scenario?

  • A. Try using SPC to measure transaction times at a warehouse
  • B. Lower Control Limit for the R chart equals zero.
  • C. A process is already under statistical control before SPC is put into place.
  • D. The Control Limitations exceed the limits specified by the customer.

Correct Answer: D

Q9)Which set of charts is ideal if continuous data is subgrouped and a process has outliers?

  • A. Individual—Moving Range
  • B. Xbar-R Charts
  • C. Xbar-S Charts
  • D. nP and P Charts

Correct Answer: B

Q10)Which graphic would be used to search for trends in the data after a Belt has smoothed the data?

  • A. Moving Average Chart
  • B. Multi-Vari Chart
  • C. X bar Chart
  • D. Pareto Chart

Correct Answer: A

Q11)A Belt creates a Control Plan to bring a Lean Six Sigma project to a close. When may the Control Plan be shut down?

  • A. A control plan is a dynamic document.
  • B. Following receipt of the Champion’s approval
  • C. Within 30 days of the LSS project review panel meeting
  • D. Following the project’s presentation at the award ceremony.

Correct Answer: A

Q12)When do you find that Multiple Linear Regressions (MLR) are most appropriate?

  • A. Relationships that are not linear between the inputs X and the output Y
  • B. Uncertainty in the direction of the X-Y linear relationship.
  • C. Relationships between more than one X and Y (output) (Input)
  • D. Not using a designed experiment if it is not essential
  • E. Assuming that the X’s are independent of one another

Correct Answer: C, D and E

Q13)Which of the following statements applies to the regression analysis presented here?

  • A. A multiple linear regression is exemplified by this regression.
  • B. This regression serves as an illustration of a cubic regression.
  • C. The majority of the process variable in heat flux is explained.
  • D. Over 80% of the process variable in heat flow can be attributed to thickness.
  • E. This regression analysis contains 26 residuals.

Correct Answer: A and D

Q14)The term o, which represents the Y axis intercept when X = 0, is present in the regression model for an observed value of Y.

  • A. True
  • B. False

Correct Answer: A

Q15)Which of the following statements regarding the fitted line plot is true?

  • A. The Energy Consumed rises as Reactant rises.
  • B. The equation has a positive 130.5 slope.
  • C. When the reactant level is set to 6, the projected output Y is very nearly -18.
  • D. Through this Linear Regression, the Reactant accounts for almost 85% of the variation in the Energy Consumed.

Correct Answer: C and D

Q16)Select the statement or statements that are untrue after reading the capability analysis presented below.

  • A. It is appropriate to presume that the procedure is a normal process.
  • B. The process moving range’s mean value is 1.78
  • C. The procedure has gotten out of hand
  • D. Subgroups were used in this capability analysis.
  • E. More dimensional values than not are outside of the tolerance.

Correct Answer: A

Q17)The actual experimental response data did not match up exactly with what a Belt had anticipated. Which of these has led to this?

  • A. Inefficiency of estimates
  • B. Residuals
  • C. Confounded data
  • D. Gap Analysis

Correct Answer: B

Q18)After examining the capability analysis presented here, choose all the claims that are accurate.

  • A. The procedure has gotten out of hand.
  • B. It is correctly assumed that the process is a Normal process.
  • C. The process moving range’s mean value is 1.78.
  • D. Subgroups were used in this capability analysis.
  • E. More dimensional values than not are outside of the tolerance.

Correct Answer: B,C, D and E

Q19)A Multi-Vari Chart’s ability to display two-way interactions visually is one of its main advantages.

  • A. True
  • B. False

Correct Answer: A

Q20)A bias in sampling is a mistake that results from a lack of independence between random samples or from the use of systematic sampling techniques.

  • A. True
  • B. False

Correct Answer: A

Six Sigma Green Belt (CSSGB) free practice test
Menu