Design – Implementation Guide Relationship

  1. Home
  2. Design – Implementation Guide Relationship

Relationship exist between the COBIT ® 2019 Design Guide and the COBIT ® 2019 Implementation Guide. The relationship is listed in the COBIT 2019 Framework. The relationship connects both the guides.

The COBIT ® 2019 Design Guide provides a outline for enterprises through the use of design factors. The Design Guide helps in creating a governance program which generates value from information and technology.

The COBIT ® 2019 Implementation Guide and the COBIT ® 2019 Design Guide are related on various aspects, as

  • The Step 1 ( or Understand the enterprise context and strategy) of the COBIT ® 2019 Design Guide, connects to Phase 1 ( or What are the drivers? – Continuous improvement or CI tasks) of the COBIT ® 2019 Implementation Guide
  • The Step 2 ( or Determine the initial scope of the governance system), Step 3 ( or Refine the scope of the governance system) and Step 4 (or Conclude the governance system design) of the COBIT ® 2019 Design Guide, connects to Phase 2 (or Where are we now? – CI tasks ) of the COBIT ® 2019 Implementation Guide
  • The Step 4 (or Conclude the governance system design) of the COBIT ® 2019 Design Guide, connects to Phase 3 (or Where do we want to be? – CI tasks ) of the COBIT ® 2019 Implementation Guide
Source: ISACA®, COBIT® 2019 Framework: Introduction and Methodology, USA, 2018

Go back to COBIT 2019 Tutorial page