MB-320: Microsoft Dynamics 365 for Finance and Operations Manufacturing Sample Questions

  1. Home
  2. MB-320: Microsoft Dynamics 365 for Finance and Operations Manufacturing Sample Questions
MB-320 Sample Questions
Question 1  – During your time as a production supervisor at a chemical processing plant, you must keep track of each batch’s attributes. Whenever a batch order for these chemicals is completed, automated quality orders need to be generated, and attributes must be updated and tracked. What three actions will you perform? 
  • A. Assigning the attributes to the chemicals
  • B. Assigning the attributes to the appropriate test on the test group
  • C. Creating attribute types
  • D. Setting up batch attributes
  • E. Creating a test instrument for each attribute

Correct Answer: ADE

Question 2  – A manufacturer produces HDMI cables. The manufacturer will occasionally buy unbranded HDMI cables from a vendor in order to keep up with demand. The company must make use of the same item number irrespective of whether they make them or buy the item. What should you do?
  • A. Selecting route type as vendor on the route operation when the item is to be purchased.
  • B. In default order settings, selecting Production for the default order type
  • C. Creating a new vendor resource when the item is to be purchased
  • D. In default order settings, selecting Purchase for the default order type

Correct Answer: A

Question 3  – A company is producing paints and assembles bicycle frames. Assembly operations must take queue times into account and paint drying time must be taken into account before assembly operations can begin. Which two of the following options can you use?
  • A. Entering a value in the queue time after field for the painting operation
  • B. Making a resource group for each size and color and assigning that group to the operation
  • C. Entering a value in the transit time on the painting operation
  • D. Entering a value in the queue time before field for the assembly operation
  • E. Building capabilities for each resource related to color

Correct Answer: AD

Question 4 – Production orders and resource calendars are maintained by you for a manufacturing company, and all production resources use the same production calendar. Your facility has a defective machine that must be closed for repairs for the next two days. You need to configure the resource calendar so that the resource is not available for production for the next two days. What should you do?
  • A. Navigating to the resource group. Changing the calendar to closed on the resource group.
  • B. Navigating to the calendar used for production and closing the next two days.
  • C. Navigating to the resource. Changing the calendar to closed on the resource.
  • D. Navigating to the resource and selecting Calendar deviations. Setting the calendar to closed for the next two days.

Correct Answer: D

Question 5 – Dynamics 365 Supply Chain Management is being implemented in a manufacturing company with a standard costing model for valuing inventory. When the system is set up, all areas that affect the item’s standard cost must be configured correctly so that a complete standard cost can be calculated using routing, BOMs and overhead. You are required to verify that all areas of the system are correctly configured. Which of the following objects DO NOT impact the standard cost of manufactured items?
  • A. item group
  • B. cost groups
  • C. cost categories
  • D. BOM formula

Correct Answer: D

Question 6 – We are redesigning and retooling a manufacturing plant in order to group similar operations into cellular ones in order to improve efficiency and minimize wasted time between activities. We are considering Dynamics 365 Supply Chain Management. In order to ensure that raw materials are located close to where they are needed, they do not want to lose visibility into reorders. For setting up their environment, which of the given production type would you implement?
  • A. Lean manufacturing
  • B. Process manufacturing
  • C. Discrete manufacturing
  • D. Manufacturing execution

Correct Answer: A

Question 7 – A company is looking to use Dynamics 365 Supply Chain Management, and is in the process of redesigning and retooling an existing manufacturing plant to support a large long-running contract. They want to be able to forecast capacity to easily ramp up for additional products. For setting up their environment, which of the given manufacturing type would you implement?
  • A. Lean
  • B. Discrete
  • C. Job shop
  • D. Process

Correct Answer: C

Question 8 – The same factory produces generic and name-brand paper plates under standard costing, using the same Bill of Materials, and following the same routes. The finance and production teams require a way for viewing individual raw material consumption costs in the ledger. You are required to add a production group for controlling postings to the ledger. What would you do?
  • A. Creating a production group for the finished good item
  • B. Updating the cost of the generic finished good item
  • C. Creating a production pool for the finished good item
  • D. Creating a new Bill of materials with alternate costs for the raw material

Correct Answer: A

Question 9 – A manufacturing company uses advanced warehouse management functionality for a new warehouse. After releasing a production order, you observe that the warehouse work for raw material picking was not generated. You are required to go through the warehouse management setup for determining what is missing. Which three of the given setup configurations should you validate?
  • A. Work template for raw material picking
  • B. Wave template
  • C. Directive codes
  • D. Confirm the production output location on your resource group
  • E. Location directive for raw material picking

Correct Answer: ACE

Reference: https://docs.microsoft.com/en-us/dynamics365/supply-chain/warehousing/control-warehouse-location-directives

Question 10  –  A lubricant and grease manufacturing company wants to use Dynamics 365 Supply Chain Management in order to make products whose characteristics are tracked throughout the production process and are associated with the packaged product. You are required to identify which production methodology should be used.
  • A. Discrete manufacturing
  • B. Lean manufacturing
  • C. Process manufacturing
  • D. Job shop manufacturing

Correct Answer: C

Question 11 – An organization produces multiple products that require an installation kit including 50 components, but does not want these components to appear on every Bill of Materials (BOM). BOM kit includes all 50 components, but you don’t want those components to be part of a separate order, so you have to create a different BOM for the finished product. What would you do?
  • A. Selecting Phantom on the engineering fast tab on the kit item
  • B. Changing the coverage group on the kit item to Manual
  • C. Changing the line type to Phantom
  • D. Changing the line type to Pegged supply

Correct Answer: C

Question 12  – DRAG DROP –
Due to the time it takes to post raw materials when production orders are processed, a company overstates on-hand raw materials. As soon as a finished good is reported as finished, all items used to manufacture it must be consumed. It is critical that all bill of materials lines are not changed to use the flushing principle, and that all production orders consume raw materials when they are completed. Which four actions will you perform in sequence? 
To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:
ActionsAnswer area
In the production order status section of Production control, select report as finished
In the production order status section of Production control, select start
On the bills of materials section of Inventory management, select Report as finished
Select Make default for all users
In the picking list journal, select Always in the Automatic BOM consumption
Select default values in the ribbon

Correct Answer:

ActionsAnswer area
In the production order status section of Production control, select report as finishedIn the production order status section of Production control, select start
In the production order status section of Production control, select startIn the picking list journal, select Always in the Automatic BOM consumption
On the bills of materials section of Inventory management, select Report as finishedIn the production order status section of Production control, select report as finished
Select Make default for all usersSelect Make default for all users
In the picking list journal, select Always in the Automatic BOM consumption
Select default values in the ribbon
Question 13  – DRAG DROP
Scheduled resources and estimated production costs are estimated using route operations by skateboard manufacturers, and all products use the same sub-assembly item and sanding process. You notice that a sanding belt resource is capable of producing more units, which makes the production schedule inaccurate. For all future orders, you need to permanently change the quantity the resource is able to produce, and you need to adjust the quantity of the process on the route operation. Which three of the given actions should you perform in sequence?
Select and Place:
Actions Answer Area
In the process qty, field, update the quantity
In the engineering tab of the subassemble item, select route
Select times on the operation that use the resource
Select the calendar related to the resource
Create a new working time template
Apply the new template to the resource’s calendar

Correct Answer:

Actions Answer Area
In the process qty, field, update the quantity
In the engineering tab of the subassemble item, select routeIn the engineering tab of the subassemble item, select route
Select times on the operation that use the resourceSelect times on the operation that use the resource
Select the calendar related to the resourceIn the process qty, field, update the quantity
Create a new working time template
Apply the new template to the resource’s calendar
Question 13 – DRAG DROP
Your company uses Process Manufacturing for pharmaceutical production, and you have to consolidate planned batch orders for a specific medication. There is no need to consolidate other items in the order, and it must cover two weeks of demand. There is a need to change the coverage group for the items. Which four actions should you perform in sequence?
Select and Place:
Actions Answer Area
Change the general coverage group in the master planning parameters to the newly defined coverage group
Edit the coverage period on the current coverage group on the medication
Apply the new coverage group to the medication
Delete the old coverage group from the coverage group table
Rerun the plan
Create a new item number for the medication
Create a new coverage group
Define the coverage period as the equivalent of two weeks in days

Correct Answer:

Actions Answer Area
Change the general coverage group in the master planning parameters to the newly defined coverage groupCreate a new coverage group
Edit the coverage period on the current coverage group on the medicationDefine the coverage period as the equivalent of two weeks in days
Apply the new coverage group to the medicationApply the new coverage group to the medication
Delete the old coverage group from the coverage group tableRerun the plan
Rerun the plan
Create a new item number for the medication
Create a new coverage group
Define the coverage period as the equivalent of two weeks in days
Question 14 – HOTSPOT
You are developing a new car audio system kit, and the kit configuration has restrictions based on car model, speaker size, and other expression constraints. You need to set up a new item for the car audio system, then how should you create the new product? 
Hot Area:
Answer
New release product fieldSelection 
Product subtypeitem
service
product
product master
Product dimension group (active dimensions)configuration
style
style and configuration
size and style
Configuration technologyPredefined variant
Dimension-based configuration
Constraint-based configuration

Correct Answer:

New release product fieldSelection 
Product subtypeitem
service
product
product master
Product dimension group (active dimensions)configuration
style
style and configuration
size and style
Configuration technologyPredefined variant
Dimension-based configuration
Constraint-based configuration
Question 15 – DRAG DROP
The supply chain management system Dynamics 365 is being implemented in a company that configures to order. As part of the process of developing the Bill of Materials (BOM), routes, and valid configuration combinations, the company is preparing to use the product configuration model functionality. As part of the configuration process, you must create the configuration models, constraints, and pricing. In what order will you perform the actions?
Select and Place:
Actions Answer area
Create attribute types and add them to the configuration model
Set pricing model criteria to configuration model
Add BOM lines, route operations, and the pricing model to configuration model
Add version to configuration model
Add constraints to configuration

Correct Answer:

Actions Answer area
Create attribute types and add them to the configuration modelCreate attribute types and add them to the configuration model
Set pricing model criteria to the configuration modelAdd constraints to configuration
Add BOM lines, route operations, and the pricing model to configuration modelAdd BOM lines, route operations, and the pricing model to configuration model
Add version to configuration modelAdd version to configuration model
Add constraints to configurationSet pricing model criteria to the configuration model
Question 16 – DRAG DROP
You use a conveyor line calendar that is unique to your company, while a manufacturer uses route operations and job scheduling. During the year, the company observes a decline in the number of hours a conveyor line resource is operational because of breakdowns. A temporary change needs to be made to the resource’s availability hours, and the conveyor line calendar efficiency percentage needs to be adjusted. Which three actions should you perform in sequence?

Select and Place:

Actions Answer Area
Select working times
Apply the new template to the resource’s calendar
Select the calendar related to the resource
Create a new working time template
Update the runtime on the routes that use the resource
Change the efficiency percentage on the days that need the change
Question 17 – DRAG DROP
You must create product configurations for values that are used in different types of automobile engines for a company that manufactures automobile engines. For each valve value, different gaskets and fittings are used to accommodate different engines. Each valve value is based on a master valve design. The production plan needs to be translated into aspects of Dynamics 365 Finance and Operations. Which four of the given actions would you perform in sequence?
Select and Place:
Actions Answer area
Create and release product master
Create attribute types
Create configuration groups and BOM
Create product variants
Define configuration route
Question 18 – DRAG DROP
Routing operations are used by a glass bottle manufacturer to schedule resources and keep track of manufacturing costs. A recent increase in demand has led to the company purchasing other resources, while keeping the same costs per resource. It is, however, more expensive to run the new resource. The company must be able to track cost contributions for the new resource. Your job is creating a cost category for the new resource. Which three of the given actions will you be performing in sequence?
Select and Place:
Actions Answer Area
Assign the surcharge node to the resource
Create a new cost category
Update the cost price on the existing cost categories
Create a new cost group
Assign the cost group for the indirect cost to the route operation
Assign the cost category to all route operations that use the new resource

Correct Answer:

Actions Answer Area
Assign the surcharge node to the resourceCreate a new cost group
Create a new cost categoryCreate a new cost category
Update the cost price on the existing cost categoriesAssign the cost category to all route operations that use the new resource
Create a new cost group
Assign the cost group for the indirect cost to the route operation
Assign the cost category to all route operations that use the new resource

Reference: https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/cost-management/cost-categories-used-production-routings

Question 19 – DRAG DROP
As the product design manager for a computer manufacturer, you are developing a laptop model that can be customised. Each model has restrictions regarding which hardware components can be chosen. You are responsible for creating configuration groups for hardware and software, and are required to create a new laptop item number and configuration. In which order will you perform the actions?
Select and Place:
ActionsAnswer Area
Assign a product dimension with an active configuration dimension
Create a product master with dimension-based configuration technology
Create a bill of materials version and create a configuration route
Create the configuration variants automatically by using the maintain configurations form

Correct Answer:

ActionsAnswer Area
Assign a product dimension with an active configuration dimensionCreate a product master with dimension-based configuration technology
Create a product master with dimension-based configuration technologyAssign a product dimension with an active configuration dimension
Create a bill of materials version and create a configuration routeCreate a bill of materials version and create a configuration route
Create the configuration variants automatically by using the maintain configurations formCreate the configuration variants automatically by using the maintain configurations form

Reference: https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/pim/dimension-based-product-configuration

Question 20 – DRAG DROP
A company makes use of Dynamics 365 Supply Chain Management for Process manufacturing. When employees are not working on production orders, they spend considerable time cleaning and setting up machines in the area. In order to optimise cleaning and setup time, you must group production activities. How will you set up the system? In what order will you do the tasks?
Select and Place:
Actions Answer Area
Assign sequence group IDs to resource and resource groups
Assign sequence IDs to items
Create sequence IDs specifying values and ranking
Create sequence groups

Correct Answer:

Actions Answer Area
Assign sequence group IDs to resource and resource groupsCreate sequence IDs specifying values and ranking
Assign sequence IDs to itemsCreate sequence groups
Create sequence IDs specifying values and rankingAssign sequence IDs to items
Create sequence groupsAssign sequence group IDs to resource and resource groups

Reference: https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/set-up-product-sequences

MB-320: Microsoft Dynamics 365 free practice tests
Menu