The IBM Maximo Asset Management v7.6: C2010-555 certificate test is planned for a specialized proficient responsible for supporting, carrying out, and maintaining an IBM Maximo Asset Management v7.6 solution, the asset life cycle including stock, contracts, buying, assets, work the executives, preventive maintenance, and security. This individual will be supposed to play out these tasks with restricted help from peers, product documentation, and support resources.

1.) A dispatcher has to know the accessible staff for some random day. Workers should follow time off for the dispatcher to utilize.
Where should this be possible?

A. Characterize Person Availability in the People application
B. Change Person Availability in the People application
C. Characterize Person Availability in the Calendars application
D. Change Person Availability in the Calendars application

Right Answer: B

2.) An organization has a prerequisite to provide details regarding genuine work hours, materials, administrations, and instruments utilized as work progress on a work request.
What is the earliest point in the fundamental life cycle a client can begin detailing?

A. APPR
B. COMP
C. WMATL
D. WAPPR

Right Answer: A

Explanation: Material Availability Status on Work Orders

3.) A merchant requires an installment of 20% of the price tag when the buy request (PO) is sent and the organization needs to keep the installment until 90 days subsequent to getting the thing before a definite installment is made.
How might this be achieved?

A. A Purchase Requisition would be made and three solicitations would be produced by means of the invoicing application. One receipt for 20%, one for 60%, and one for 20%.
B. A Price Contract would be made with an installment plan with a receipt of 20% at the time the PO is Approved, a receipt of 60% at the time the thing is gotten, and one more receipt for 20% 90 days after receipt.
C. A Blanket Contract would be made with an installment plan with a receipt of 20% at the time the PO is Approved, a receipt of 60% at the time the thing is gotten, and one more receipt for 20% 90 days after receipt.
D. A Purchase Contract would be made with an installment plan with a receipt of 20% at the time the PO is Approved, a receipt of 60% at the time the thing is gotten, and one more receipt for 20% 90 days after receipt.

Right Answer: D

4.) An organization wishes to bunch its area records into a progressive system to help clients in looking for resources.
How could this be achieved?

A. Location Groups can be made and LIVE areas added.
B. Location can be connected by involving the Related Records tab in the Locations application.
C. Location records should be added to an organization and can incorporate areas with an ACTIVE status.
D. Location records should be added to a framework and can incorporate areas with an OPERATING kind.

Right Answer: D

5.) An organization has assets at different locations that require maintenance. There is a prerequisite to having a solitary work request with charges rolled up to a solitary GL account.
How could that be accomplished?

A. Make a task work request for every asset.
B. Creating a child work order for every resource.
C. Add a job plan that has the assets related.
D. Add the assets in Multiple Assets, Locations, and Cls.

Right Answer: B

6.) An overseer has a prerequisite to making 44 new resources that each offer a typical design.
Which application can do this with a single activity?

A. Assets
B. Classifications
C. Item Master
D. Asset Templates

Right Answer: D

7. A client has a place with two non-independent security gatherings, Group A and Group B. Group A has a buying cutoff of $7000 and Group B has a buying cutoff of $8000.
What are the buying furthest reaches of a client who has a place with both security gatherings?

A. $7000
B. $8000
C. $15000
D. $56000

Right Answer: B

8.) What costing technique ought to be utilized assuming the receipt cost of things that are the most current in stock is required?

A. LIFO
B. FIFO
C. Standard
D. Average

Right Answer: A

9.) Which report choice gives different access points to an end client to run reports including the toolbar shortcuts of Browser View, Direct Print, Direct Print with Attachments, and direct access from application dialogs including Work Order Status Change and Inventory Reorder?

A. ERI
B. BIRT
C. Cognos
D. SQL Server

Right Answer: B

10. ) A supported work request has been allocated to an inaccurate work plan.
How would you address this?

A. Change the Job Plan Revision to the right update.
B. Clear the Job Plan field and enter the right work plan.
C. Make a Follow-up work request with the right work plan.
D. Select Remove Work Plan from the More Actions menu and enter the right work plan.

Right Answer: D

11.) The client needs to have a new position plan reference a current work plan so the information in the current work plan will be accessible without returning it.
What is the name of this element?

A. Settled work plans
B. Work plan modifications
C. Work plan groupings
D. Connection work plans

Right Answer: B

12.) A custom field has been added to the Work Order Tracking application to recognize the overseer for the natural effects of each work request.
What kind of job is utilized to relegate the work request to the ecological examiner?

A. Individual
B. Individual Group
C. A bunch of data related to the record
D. A bunch of data related to the login client

Right Answer: A

13.) A manager is expected to report genuine work hours by work request number.
In which situations with this be achieved? (Pick two.)

A. INPRG
B. WAPPR
C. PNDREV
D. CANCEL
E. COMPLETE

Right Answer: AE

14.) A fixed-plan PM should be set up.
What other setting should be chosen notwithstanding the recurrence esteem?

A. Alert Lead (DAYS) should rise to 0
B. Alert Lead (DAYS) should be more prominent than 0
C. Utilize Last Work Order’s Start Date to Calculate Next Due Date? checked
D. Utilize Last Work Order’s Start Date to Calculate Next Due Date? uncontrolled

Right Answer: C

15.) An organization has a necessity to have things in the storerooms be reordered consequently.
How might this be accomplished?

A. Reorder Escalation
B. Reorder Cron Task
C. Reorder “” Reorder Items
D. Reorder Direct Issue Items/Services

Right Answer: C

16.) An organization has a necessity to share schedule, characterization, work plan, thing depiction, and PM information.
What should be made?

A. Single association, single site climate
B. Various associations with a common site climate
C. Various associations with one site for every association climate
D. Various associations with different locales per association climate

Right Answer: A

17.) An engineer plans a very complex asset resource report created in BIRT. The designer needs to set a component to having the option to recover the report contents from the inside
Maximo for extremely huge documents that are confined by the email server.
Which element does this?

A. Direct Print
B. Email with a File URL
C. Email with a File Attachment
D. REPORT SCHEDULE cron task

Right Answer: D

18.) An organization has a necessity to have work testaments characterized.
In which application should this be possible?

A. Qualifications
B. Certifications
C. People
D. Crews

Right Answer: A

19.) An expert PM can be utilized to do which of the accompanying?

A. Make some work plan update.
B. Produce work orders for related PMs.
C. Make related PMs for a thing’s area.
D. Change the situation with work orders produced from related PMs.

Right Answer: C

20.) A chairman has a necessity to guarantee that buy demands have been supported prior to having the option to make buy orders from them.
Which settings control this way of behaving?

A. Clean the Allow PO Creation Off of Unapproved PR? checkbox in Purchasing Options.
B. Clean the Allow PO Creation Off of Unapproved PR? checkbox on the buy order.
C. Really take a look at the Require PR Approval on PO Creation? checkbox during the formation of the buy order.
D. Check the buying choice Require Approval to Convert PR to PO or Contract? (checkbox in Purchasing.

Right Answer: D